Final | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Brian Scoles
|
|
|
call Tom with any questions ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake- final ok- card signed
|
Rough-in | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Brian Scoles
|
|
|
please call tom with any questions ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake- R/I on linset and condensate drains ok- ok to cover
|
Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brian Scoles
|
|
|
repairs made and ready for re-inspection Call Tom with any questions ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake- R/I ok- ok to cover
|
Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | FAIL |
Brian Scoles
|
|
|
please call Tom Thacker ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake- condensate lines on mini split need ran in 3/4" pvc and barb fitting near head to make tie in
|
Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | CANC |
Brian Scoles
|
|
|
Please call Tom for questions ###-#### Phone #: ###-#### >> Inspection requested via web by Nick Drake Inspection cancelled from web by: Nick Drake
|