Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | P | PASS |
Chad Schwendiman
|
|
|
Please contact Josh Bennett for building access code at ###-####. TAB testing was conducted on 1/23/2020. Report will be available on Friday 1/24/2020 Phone #: ###-#### Inspection requested via web by Josh Bennett
|
Rough-in | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PASS |
Chad Schwendiman
|
|
|
Please contact Brian Eddins with questions at ###-####. Access code for building is 2805. Phone #: ###-#### Inspection requested via web by Josh Bennett
|
Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | FAIL |
Chad Schwendiman
|
|
|
Please call Josh before going onsite ###-#### Phone #: ###-#### Inspection requested via web by Josh Bennett - Fresh air and return ducts not installed per approved drawings. Bathroom ceiling only is okay to cover.
|