Final | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Jack Reynolds
|
|
|
New construction final. Approved Manual J should be in the document holder along with air balance report, etc..
call me for the garage access code. Thank you Phone #: ###-#### Inspection requested via web by jeremy wanders - final ok
|
Rough-in | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Jack Reynolds
|
|
|
crawl completed and all other corrections listed on first inspection. Phone #: ###-#### Inspection requested via web by jeremy wanders - R/I ok
|
Pressure Test | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Jack Reynolds
|
|
|
low psi 20lb test Phone #: ###-#### Inspection requested via web by jeremy wanders - 5lb flue pressure test ok - 20lb gas pressure test ok - tagged meter
|
Rough-in | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Jack Reynolds
|
|
|
rough in inspection. Phone #: ###-#### Inspection requested via web by jeremy wanders - crawl needs finished - fresh air can't terminate out roof - 5lb flue test - dryer vent needs one more seam sealed - crawl ventilation duct needs sealed
|
Pressure Test | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Jack Reynolds
|
|
|
20 lb test. low psi natural gas. Phone #: ###-#### Inspection requested via web by jeremy wanders - gauge would not zero out - penetration needs 10 mill tape installed - re test
|