Final | 12/12/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Brian Scoles
|
|
|
Starting job at 9:30 so will likely be ready for inspection by noon. Please call Kelly Buel, lead tech on site, with eta so he can make sure he is on site with you. His number is provided. If you can''t reach him, call ###-#### ext. 2. Thanks! Phone #: ###-#### Inspection requested via web by Alyssa Cromwell- a/c coil co locking caps ok
|