Complete HVAC Installation: Install Daikin ducted split system, gas piping to furnace and water heater, venting for exhaust fans & range hood, all ducting for supply and return
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/29/20205/29/20205/29/2020APASS
DetailsBrian Scoles
Please call installer on way at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum- final ok
Conference5/29/20205/29/20205/29/2020APASS
DetailsBrian Scoles
To Witness duct blast, please call installer on way at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum- duct blast test pass
Final5/28/20205/28/20205/28/2020ANR
DetailsBrian Scoles
Waiting for approved manual J from city, please homeowner 30 minutes in advance for access at ###-#### call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum
1- need approved man j onsite
2- need to remove enclosure around range duct to verify seal and ducting
3- need to witness duct blast test- please schedule
4- need to filter outside air in attic since filter grills installed
5- need locking caps on condenser

please reschedule
Rough-in1/7/20201/7/20201/7/2020APASS
DetailsBrian Scoles
R/I ok- check equipment at final
Pressure Test1/7/20201/7/20201/7/2020APASS
DetailsBrian Scoles
20lb gas pass tagged meter location-
Rough-in1/3/20201/3/20201/3/2020PPART
DetailsBrian Scoles
Please call Ryan with questions at ###-####, we are working with the city to get our manual J approved. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum- R/I will pass when gas piping is determined if needed to new dryer vent location may need to be retested if line is ran- Ryan is aware of this and will check in on this- Ok for insulation only DO NOT SHEETROCK- meter will be tagged once gas piping resolved- inert tape need installed thru wall or sleeve with pvc between stucco and piping- building inspector is aware of insulation only at this time
Rough-in12/30/201912/30/201912/30/2019PFAIL
DetailsBrian Scoles
Please call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum
1- need city approved man j onsite none found
2- need to remove stucco around gas line penetration at meter and install 10 mil inert tape on pipe and retest gas line