Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberMEC20-00019
StatusIssued
Name ANDREW BARTON
Site Address 2726 N 29TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Redoing of the heating system. Adding a new furnace, coil and air conditioner. Added a gas range line and a range hood vent. Also added some cold air returns. Manuel I is on the job and approved.


Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Rough-in7/13/20207/14/20207/14/2020ANR
DetailsBen Livingston
virtual inspection // Drew Phone #: ###-####
- need pressure test to complete rough in
Pressure Test1/7/20201/8/20201/8/2020AFAIL
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Heath Taylor
- test at 16lb-
Pressure Test1/2/20201/3/20201/3/2020AFAIL
DetailsBen Livingston
The manuel j is in the main hall way of the new part of the home. Its screwed to the wall. About eye level. The gas pressure test gauge is at the range on the floor. Let me know if theres anything else I need to do? Thank you, Heath Taylor Phone #: ###-#### Inspection requested via web by Heath Taylor
- gas test at 15lb -
Rough-in1/2/20201/3/20201/3/2020APART
DetailsBen Livingston
The manuel j is in the main hall way of the new part of the home. Its screwed to the wall. About eye level. Let me know if theres anything else I need to do? Thank you, Heath Taylor Phone #: ###-#### Inspection requested via web by Heath Taylor
- rough in will pass when pressure test passed-