Final | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Jack Reynolds
|
|
|
IF QUESTIONS CALL NOLAN @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Jack Reynolds
|
|
|
if questions call Nolan M. @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 2- 20lb gas pressure tests ok - tagged both gas lines at meter location
|
Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | FAIL |
Jack Reynolds
|
|
|
if questions call Nolan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann - gas gauge should be 30lb gauge at 20 lb change out gauges and reschedule
|
Pressure Test | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | FAIL |
Jack Reynolds
|
|
|
if questions call Nolan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann - need City of Boise approved prints onsite for gas piping pressure test
|