Permit Information
Permit NumberMEC20-00225
StatusIssued
Name HOBSON FABRICATING CORP
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberH9979
ePlanReviewNo
Description
New: HVAC for tenant improvements to all three portions of the building with the work to be completed in three phases.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Rough-in8/5/20208/5/20208/5/2020PPASS
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Okay to cover hard lids in rooms 270 C, D, E, F, G.
Rough-in8/4/20208/5/20208/5/2020AFAIL
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - No access, Called and left a message, no return call while I was in the area
Rough-in7/30/20207/30/20207/30/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- seal on duct west side of corridor from north to south ok excluding corriidor, rm 222h 222g 222f and hard lids- ok to insulate- call in when rooms, corridor and all hard lids ready
Rough-in7/10/20207/13/20207/13/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- Phase 2 seal on duct column D to east and from column 6.1 to 11 north to south- ok to insulate
Rough-in5/21/20205/22/20205/22/2020APART
DetailsBrian Scoles
final on the 1st floor Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- ok to occupy 1st floor phase 1
Rough-in5/7/20205/8/20205/8/2020APART
DetailsTroy James
Final Phase 1 2nd floor Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
okay to occupy phase 1
Final3/27/20203/30/20203/30/2020ACANC
DetailsBrian Scoles
Ryan Rossi - Job #9910 - Construction (PC) - MTC2 - B2 - MI Ebeam 9K up grade - WO #14979946 - CP #40511 Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- schedule wrong inspection- I scheduled right on per Ryan phone call
Rough-in3/26/20203/26/20203/26/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- all areas west of grid line D ok for cover- insulation flex and registers all good- excluding wood slat ceiling south end
Rough-in3/17/20203/18/20203/18/2020PPASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok to cover east north side and west south corner hard lid
Rough-in3/12/20203/13/20203/13/2020APASS
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
okay to cover south east drop ceiling first floor, hard lid hallway west side, restrooms and maintenance room
Rough-in3/9/20203/9/20203/9/2020PPASS
DetailsTroy James
Hard lid 1st floor Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok hard lids east side 1st floor
Rough-in3/3/20203/3/20203/3/2020PPASS
DetailsTroy James
2 a Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
okay cover ceiling east side
Rough-in2/28/20202/28/20202/28/2020PPART
DetailsTroy James
cover inspection Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
okay to drop ceiling tiles west side
Rough-in2/24/20202/25/20202/25/2020APASS
DetailsTroy James
Hard lid cover on 2nd floor Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
ok hard lid areas for cover 2nd floor
Rough-in2/14/20202/14/20202/14/2020PPART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- 1st floor area B east side seal on duct ok from column F to A and north to south excluding bathrooms- ok to insulate
Rough-in1/31/20202/3/20202/3/2020PPART
DetailsTroy James
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Okay second floor east half to insulate ductwork.
Rough-in1/23/20201/24/20201/24/2020APART
DetailsTroy James
Ok to cover on the 2nd floor Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Okay to insulate ducts at second level west of stairs.
Rough-in1/20/20201/21/20201/21/2020APART
DetailsTroy James
cover - rooms
Please call Dylan ###-#### Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Okay to insulate ductssegmant A to the restrooms.