Final | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | PASS |
Jack Reynolds
|
|
|
Final inspection as the inspection from Jim Page passed Phone #: ###-#### Inspection requested via web by Devry King - final ok occ card signed
|
Final | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | CANC |
Jack Reynolds
|
|
|
@ 12:30 Fire , life & safety inspector will be there. Installer will be there customer is wanting this to be finaled off either at the same time or soon there after Phone #: ###-#### >> Inspection requested via web by Devry King Inspection cancelled from web by: Devry King
|
Final | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | PEND |
Jack Reynolds
|
|
|
Per inspector on 3/13/20 This needs tested for operation of smoke shut down. This was inspectors request from our final inspection request. Phone #: ###-#### Inspection requested via web by Devry King - fire inspector will need to inspect smoke shut down of RTU. I have been in contact with Joe hvac contractor and owner of building about this topic.
|
Final | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | FAIL |
Jack Reynolds
|
|
|
Jonathon is the contact. Installer is requesting a pressure, rough in and final inspection Phone #: ###-#### Inspection requested via web by Devry King - large unit on south side of building needs to be checked for a smoke detector. And will need to be tested for operation of smoke shut down.
|
Rough-in | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Jack Reynolds
|
|
|
Jonathon is the contact. Installer is requesting a pressure, rough in and final inspection Phone #: ###-#### Inspection requested via web by Devry King -R/I ok
|
Pressure Test | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Jack Reynolds
|
|
|
Jonathon is the contact. Installer is requesting a pressure, rough in and final inspection Phone #: ###-#### Inspection requested via web by Devry King - 20lb gas pressure test ok
|
Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | FAIL |
Jack Reynolds
|
|
|
This is a duct work inspection only. Joe our installer will be there from 8:15 am -2 pm Phone #: ###-#### Inspection requested via web by Devry King - changes to HVAC need to be submitted to city for review - will need to see gas pressure test on new gas line - water heater flue needs 1" clearances and insulation shield installed - exhaust fans in showers need installed
|