Final | 4/7/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Brian Scoles
|
|
|
Francisco- ###-####- final ok- card signed
|
Final | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | PART |
Brian Scoles
|
|
|
Francisco is the contact. Air balance will be emailed to you. Phone #: ###-#### Inspection requested via web by stan lillquist- need trap installed on RTU not sure whos doing this- rest is good- temp occupancy
|
Rough-in | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Brian Scoles
|
|
|
Cover inspection. Francisco is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist- ok for ceiling cover- need access to roof at final
|
Rough-in | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Brian Scoles
|
|
|
Cover hardlids in the restrooms. Francisco is the contact Phone #: ###-#### Inspection requested via web by stan lillquist- R/I ok- hard lids ok to cover
|
Rough-in | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PART |
Brian Scoles
|
|
|
Duct Wrap. Francisco is the contact. Phone #: ###-#### Inspection requested via web by Scott Corriea- seal on supply and R/a ok- ok to insulate- call in when hard lids are ready for exhaust
|