Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Brian Scoles
|
|
|
Please call 1/2 hr. before arrival: Angela ###-#### Phone #: ###-#### Inspection requested via web by Bryan Palmer- radiant floor heat final ok
|
Pressure Test | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Brian Scoles
|
|
|
Pressure test for radiant floor tubing. Phone #: ###-#### Inspection requested via web by Bryan Palmer- 100lb hydro test pass- call in final when ready
|