Final | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Brian Scoles
|
|
|
installer Dakota ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- package roof unit ducting co ok
|
Final | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | CANC |
Brian Scoles
|
|
|
INSTALLER DAKOTA ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- per phone call with installer will reschedule
|