Final | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Brian Scoles
|
|
|
Brandon is on site, you can call him for pressure test timing. Phone #: ###-#### Inspection requested via web by max sanders
|
Pressure Test | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Brian Scoles
|
|
|
Brandon is on site, you can call him for pressure test timing. Phone #: ###-#### Inspection requested via web by max sanders- 20lb gas pass to bbq and range co installed
|