Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Jack Reynolds
|
|
|
For Make up air for range hood, please call contractor 30 minutes in advance for access at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum - make up air and range vent ok R/I ok
|
Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Jack Reynolds
|
|
|
Please call contractor 30 minutes in advance for access at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum -R/I ok
|
Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | FAIL |
Jack Reynolds
|
|
|
Please call contractor 30 minutes in advance for access at ###-#### and call Ryan with questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Rhonda Marcum - all b vent needs 1" clearances - need to see insulation sheild in attic - furnace connection to common vent needs to connect at bottom of b vent wye and water heater needs to connect at the highest point in the b vent wye - range hood is a 600 cfm and will need make up air or be under 400 cfm
|