Rough-in | 3/8/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak
|
Conference | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | DONE |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- went over exhaust penetrations and need to resubmit man j for the way system will be installed
|
Rough-in | 2/26/2020 | 2/27/2020 | 2/27/2020 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- need to schedule conference and have man j onsite
|