Final | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Brian Scoles
|
|
|
All penetrations sealed, UV sealant on all exterior lines and condensate lines run Phone #: ###-#### Inspection requested via web by Clay Bonvillain- final ok
|
Final | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | FAIL |
Brian Scoles
|
|
|
3/19/20 All lines run. Ready for inspection. Waiting for power Phone #: ###-#### Inspection requested via web by Clay Bonvillain- need condensate drains ran- need uv protection on all arma flex for linesets on roof- need to seal all lineset penetration thru PVC sleeves weather tight on roof
|