Final | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - final ok
|
Rough-in | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas -R/I ok
|
Rough-in | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - b vent upstairs needs 1" clearances - combustion air openings are not big enough, size openings per btu ratings of equipment being installed in mech room
|
Pressure Test | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - 5lb flue pressure test ok - 20lb gas pressure test ok - tagged meter location
|