Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberMEC20-00879
StatusFinaled
Name ALLEY HEATING & COOLING
Site Address 7200 W DENTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Complete HVAC Installation: DUPLIX,
FURNACE, DUCT-WORK, BATH VENT, KITCHEN VENT, A/C, GAS-PIPING, FIRE-PLACE, WATER HEATER VENT, DRYER VENT,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/8/20206/9/20206/9/2020APASS
DetailsChad Schwendiman
CORRECTIONS MADE PLEASE REINSPECT Phone #: ###-#### Inspection requested via web by Oleg Chervak
Final6/5/20206/5/20206/5/2020PFAIL
DetailsBrian Scoles
garage doors will be open Phone #: ###-#### Inspection requested via web by Oleg Chervak- 7200 needs condenser pad leveled- 7226 need pvc intake supported and leveled horizontally- verify gas valves are on on fireplaces
Final6/1/20206/2/20206/2/2020ACANC
DetailsBrian Scoles
DOORS WILL BE OPEN Phone #: ###-#### >> Inspection requested via web by Oleg Chervak Inspection cancelled from web by: Oleg Chervak
Pressure Test3/11/20203/12/20203/12/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass both units tagged meter locations- 5lb flue pass both units
Rough-in3/11/20203/12/20203/12/2020PPASS
DetailsBrian Scoles
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I HVAC and fireplace ok both units
Rough-in3/10/20203/11/20203/11/2020PFAIL
DetailsBrian Scoles
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak-
7200
1- need to resubmit man j carrier equipment installed shows payne on man j
2- gas test at zero
3- need insulation shield installed on fireplace flue 1st floor in joist bay and secure flue in chase above fireplace
4- need to seal transfer boots
5- remove metal thimble second floor attic and replace with flat metal and insulation shield needs 1" clearance to flue

7226
1- need to resubmit man j carrier equipment installed show payne on man j
2- fireplace needs secured to structure and flue needs secure to structure aboce fireplace in chase
3- need to seal transfer boots 1st floor
4- remove metal thimble piece in attic and replace with flat metal and insulation shield needs 1" clearance to flue
5 flue test at zero

left notices front room window both units
Pressure Test3/10/20203/11/20203/11/2020PFAIL
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 7200 gas test fail at 3psi- flue test pass- 7226 20lb gas pass tagged meter location- flue test at zero