Final | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Chad Schwendiman
|
|
|
CORRECTIONS MADE PLEASE REINSPECT Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Final | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | FAIL |
Brian Scoles
|
|
|
garage doors will be open Phone #: ###-#### Inspection requested via web by Oleg Chervak- 7238 need gas piping completed to furnace- verify gas valves to fireplaces are turned on- 7252 ok
|
Final | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | CANC |
Brian Scoles
|
|
|
DOORS WILL BE OPEN Phone #: ###-#### >> Inspection requested via web by Oleg Chervak Inspection cancelled from web by: Oleg Chervak
|
Rough-in | 3/11/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Brian Scoles
|
|
|
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I HVAC and fireplace ok both units
|
Pressure Test | 3/11/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass both units tagged meter locations- 5lb flue pass both units
|
Rough-in | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | FAIL |
Brian Scoles
|
|
|
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak-
7238 1- need to resubmit man j carrier equipment(furnace/ac) installed and shows payne on man j 2- need to secure fireplace flue to structure 1st floor chase above fireplace 3- firecaulk missing 2nd floor at floor on fireplace flue 4- insulation shield needs 1" clearance and flue needs 1" clearance to wood in attic/ remove metal in attic around fireplace flue and replace with flat metal in place has piece from thimble and firecaulk all the way around pipe 5- missing seal on supply duct 2nd floor on both seams in chase 6- exposed insulation in crawl needs vapor barrier/taped at crawl entrance 7- need to seal transfer boots 1st floor left notice front window
7252 1- need to resubmit man j carrier equipment (furnace/ac) installed and man j shows payne 2- need to secure fireplace flue to structure 1st floor chase above fireplace 3- need to seal transfer boots 1st floor 4- draft stop 2nd floor on fireplace flue has gap need to be flush with floor not up on one side of 2x4 and seal open hole in attic draft stop 5- need intakeon furnace needs ran to attic or outside since in house left notice front window
|
Pressure Test | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass both units tagged meter location- 5lb flue pass both inits
|