Final | 6/10/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Brian Scoles
|
|
|
AC: 2019 Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
Pressure Test | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 5lb flue pass- 20lb gas pass
|
Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 1- need city approved man j onsite none found 2- flue gauge at zero 3- b vent in garage ceiling needs 1" clearance to sheetrock and wood joist thats notched 4- b vent 2nd floor chase needs 1" clearance to flex duct at floor needs insulation shield installed 5- need to pan offin approved manner around supply, ra and b vent 2nd floor chase where wood framing cut out to big for ducts and b vent
left notice back window
|
Pressure Test | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 20lb gas pass tagged meter location- flue gauge at zero
|