Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberMEC20-01113
StatusIssued
Name KMD MECHANICAL
Site Address 101 S ALLUMBAUGH WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration:
1) Provide and Install HVAC and Dehumidification equipment as required.

2) Provide and Install controls as required.

3) Provide and Install grilles and registers.

4) Provide and Install ductwork as required.

5) Provide and Install insulation
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Rough-in6/18/20206/18/20206/18/2020PPART
DetailsBrian Scoles
Mechanical Grid Inspection for Stage please call Mike with questions ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin- 1st floor registers and flex ok- ok for ceiling tiles- 233 conference room mini split ok- need commissioning report per approved drawings- still need high ceiling grid installed and registers hooked up call in when ready
Rough-in6/12/20206/12/20206/12/2020APART
DetailsBrian Scoles
Mechanical Grid Inspection for AM please contact Mike with any questions. Phone #: ###-#### Inspection requested via web by Karl Hestekin- all areas second floor registers and flex ok for ceiling tiles excluding conference, high area and west stair well will look at on 1st floor grills- RTU 12 needs plumbing vent 3 ft higher or 10' away from economizer- RTU 2 needs vertical flue extension installed due to not being 10' from economizer on RTU 8- need condensate drains completed by plumber- all outside duct seal ok and internally lined to R-12- Mini splits still need completed
Rough-in5/20/20205/20/20205/20/2020PPASS
DetailsBrian Scoles
Mechanical Duct Seal Inspection needed for Children''s Therapy please contact Mike With any questions. Phone #: ###-#### Inspection requested via web by Karl Hestekin- R/I ok all areas ok- ok for cover- still need to look at roof ducting
Rough-in5/13/20205/13/20205/13/2020PPASS
DetailsBrian Scoles
Mechanical Duct Wrap Inspection needed for Children''s Therapy please contact Mike with any questions ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin- 2nd floor south side seal on duct ok-ok to insulate excluding RTU 4 and 12 still installing these 2 units- call in when ready
Rough-in5/7/20205/8/20205/8/2020APASS
DetailsJack Reynolds
Mechanical Cover Inspection for bathroom in pool area please contact Mike with any questions ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin
- R/I duct seal in pool bathrooms and wall stacks ok
- duct work above pool room celing still needs R/I finished
Rough-in4/28/20204/29/20204/29/2020APART
DetailsBrian Scoles
Duct seal inspection needed on the 2nd floor. You may contact Mike Desimone at ###-####. Phone #: ###-#### Inspection requested via web by Karl Hestekin- 2nd floor north side of hallway seal on all ducts ok- ok to insulate
Rough-in4/20/20204/21/20204/21/2020APASS
DetailsBrian Scoles
2nd-floor duct seal inspection needed for AM please contact Mike Desimone at ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin- 2nd floor south east corner ducting off RTU seal ok- ok to cover- middle stairwell southside to north all ducting seal ok ok to cover- all chases second foor ok to cover- insulation and seal complete these chases
Rough-in4/7/20204/8/20204/8/2020APART
DetailsBrian Scoles
Mechanical Cover Inspection Needed for AM 2nd floor bathrooms. Please contact Mike with any questions ###-####. Phone #: ###-#### Inspection requested via web by Karl Hestekin- 2nd floor hard lid seal on duct ok- ok to insulate supply- 2 shafts 2nd floor seal ok- ok for insulation- need to see all insulation in shafts prior to cover
Rough-in3/31/20204/1/20204/1/2020APART
DetailsBrian Scoles
Duct Seal Inspection Needed For A.M. Please Contact ###-#### Mike Desimone Phone #: ###-#### Inspection requested via web by Karl Hestekin- 1st floor seal all duct ok- ok to insulate- 2nd floor shaft ducting for RTUs 1 2 3 5 6 7 and 11 seal ok- ok for insulation these shafts only
Rough-in3/16/20203/17/20203/17/2020APART
DetailsBrian Scoles
Mechanical Cover Inspection needed for Children''s Therapy. Please contact Mike Desimone with any questions ###-#### Thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- approved drawings onsite- seal on misc ducts ok marked with x on contractors print- ok to insulate these ducts only- will look at remainder on next inspection- seal on exhaust duct above bathroom and janitor closet ok- ok for cover hard lids only
Conference3/16/20203/17/20203/17/2020ACANC
DetailsBrian Scoles
Mechanical Duct Seal Inspection needed for Children''s Therapy. Please contact Mike Desimone with any questions ###-#### Thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- no conference needed was R/I
Final8/13/20208/14/2020 A 
DetailsBrian Scoles
Mechanical Final Inspection needed for AM (As soon as you can please.) Please contact Mike with any questions ###-#### thank you. Phone #: ###-#### >> Inspection requested via web by Karl Hestekin