Rough-in | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- Reinspect for rerouting of lineset
|
Rough-in | 4/4/2020 | 4/6/2020 | 4/6/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- R/I ok
|
Rough-in | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak
|
Conference | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | DONE |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rubin Chervak- discussed condenser location- need bld conference for fire block penetration
|