Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Brian Scoles
|
|
|
please call Shawn prior to arrival for access. thanks, Phone #: ###-#### Inspection requested via web by Nicholas Paige- phase 2 all rooms flex registers and seal ok- ok for ceiling tiles all areas- call in final when ready
|
Rough-in | 7/9/2020 | 7/10/2020 | 7/10/2020 | A | PART |
Brian Scoles
|
|
|
Please contact John Burks prior to arrival for access. Masks are required on this project. thanks. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Nicholas Paige- Phase 1 seal all ducts, registers and flex ok- ok for ceiling tiles all phase 1 area
|
Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 | P | PART |
Brian Scoles
|
|
|
partial cover inspection. please contact shawn prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige- 1 64x30 south end and 1 60x32 north end R/A duct above soffit ok to cover
|
Pressure Test | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Brian Scoles
|
|
|
pressure gauge has been replaced. Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas pass to water heater- ok to cover wall
|
Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | FAIL |
Brian Scoles
|
|
|
Hydronic - Please call john prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige- not hydronic test- 20lb gas test failed gauge wont zero out
|