Final | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Brian Scoles
|
|
|
CONTRACTOR WORKING ON SITE Phone #: ###-#### Inspection requested via web by Aaron Alandt- final ok
|
Final | 6/16/2020 | 6/17/2020 | 6/16/2020 | A | CANC |
Brian Scoles
|
|
|
PROJECT MANAGER - KEVIN ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
Final | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | CANC |
Brian Scoles
|
|
|
PER KEVIN ABBOTT AT WESTERN (208)-###-#### PLEASE FINAL OUT TODAY? Phone #: ###-#### Inspection requested via web by Aaron Alandt- should have been R/I inspection- range hood needs installed to final out
|
Rough-in | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Brian Scoles
|
|
|
PER KEVIN ABBOTT AT WESTERN (208)-###-#### PLEASE FINAL OUT TODAY? Phone #: ###-#### Inspection requested via web by Aaron Alandt- R/I on bath fan, range hood and return ducting ok- virtual video with Kevin onsite
|
Final | 4/17/2020 | 4/17/2020 | 4/17/2020 | A | NR |
Brian Scoles
|
|
|
isaac is conact ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- called number listed no answer- went by and talked with homeowner- due to covid-19 the city of boise has suspended inspections in occupied dwellings until 4-30-20- please call ###-#### to reschedule after this date- inspection can be done by virtual video-
|