Rough-in | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Brian Scoles
|
|
|
Please call Steve about 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-RTU 102 seal on medium and remainder of low pressure in hallway ok- ok to insulate- call in hard lids and roof when ready
|
Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | P | PASS |
Brian Scoles
|
|
|
Please call Steve when you are on your way, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- RTU 101 low pressure seal ok- ok to insulate- RTU 102 north half building low pressure duct seal ok- ok to insulate
|
Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 | P | PART |
Chad Schwendiman
|
|
|
Please call Steve at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to insulate the low side ductwork for RTU 101 in the 10 rooms off the side of the big main area
|
Pressure Test | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | PASS |
Eric Strole
|
|
|
Please call Don at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-20 lb gas test of 2 1/2" line to last roof top unit on roof pass.
|
Rough-in | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Chad Schwendiman
|
|
|
Please call Steve at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Okay to insulate ductwork for RTU 100, Okay to insulate medium pressure duct work for RTU 101.
|
Pressure Test | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Chad Schwendiman
|
|
|
Please call Don at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 20lb gas pass for piping on roof and down to exterior penetration
|
Rough-in | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PART |
Chad Schwendiman
|
|
|
Please call Mason at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Duct seal okay for area B bathrooms
|
Rough-in | 6/25/2020 | 6/29/2020 | 6/29/2020 | A | PART |
Chad Schwendiman
|
|
|
Please call Mason at least 30 min prior to inspection, thank you! (When you call him, please ask for Mergatroid, he wouldn''t be expecting that.) Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Duct seal okay form bathrooms in area A. Need to reschedule inspection after rough-in to hard ids has been completed.
|
Pressure Test | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Chad Schwendiman
|
|
|
Please call Don at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 20lb gas pass for piping to the water heater
|
Rough-in | 8/13/2020 | 8/14/2020 | | A | |
Brian Scoles
|
|
|
Please call Steve about 30 min prior to inspection, thank you! Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum
|