Final | 7/7/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Jack Reynolds
|
|
|
Please call the number that is provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch - final ok
|
Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PASS |
Jack Reynolds
|
|
|
Please call the phone number provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch - R/I ok
|
Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | P | FAIL |
Jack Reynolds
|
|
|
Please call the number provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch - fresh air termination cant go out roof - floor boots need sealed - duct work needs sealed - dryer vent needs backdraft and no screen
|
Pressure Test | 4/27/2020 | 4/28/2020 | 4/28/2020 | P | PASS |
Jack Reynolds
|
|
|
Please call the number provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch - 5lb flue test ok - 20lb gas test ok
|