Final | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Jack Reynolds
|
|
|
Please call for access Joe ###-#### Phone #: ###-#### Inspection requested via web by Joe Taylor - final ok
|
Rough-in | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joe Taylor- R/I ok- check equipment at final not set on R/I
|
Rough-in | 4/16/2020 | 4/20/2020 | 4/20/2020 | A | FAIL |
Brian Scoles
|
|
|
Add pressure test Phone #: ###-#### Inspection requested via web by Joe Taylor 1- need city approved man j onsite 2- dryer vent is to long with fittings installed 35 feet max including fittings
|
Pressure Test | 4/16/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Brian Scoles
|
|
|
Add rough in Phone #: ###-#### Inspection requested via web by Joe Taylor- 20lb gas pass tagged meter location
|