Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberMEC20-01576
StatusIssued
Name HIGH EFFICIENT HEATING & COOLING
Site Address 1110 N DAWN DR
Project Name 
Customer Number0163
ePlanReviewNo
Description
Complete HVAC Installation: Install complete HVAC system on new construction house with gas lines.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Rough-in4/27/20204/28/20204/28/2020APASS
DetailsBrian Scoles
Ready for reinspection. Man j changed Phone #: ###-#### Inspection requested via web by Russ Curtis- R/I ok- one tap in crawl needs insulated by final in master bedroom crawl opening
Rough-in4/22/20204/23/20204/23/2020AFAIL
DetailsBrian Scoles
Ready for rough in inspection and gas line pressure and pvc flu pressure test. House open Phone #: ###-#### Inspection requested via web by Russ Curtis
1- dryer vent can not run in 2x4 wall needs firred out or reroute in crawl
2- need 10 mil tape on gas line penetration thru wall at meter location
3- line set needs installed on R/I
4- front bedroom missing 1 supply per approved man J onsite

left correction notice at furnace
Pressure Test4/23/20204/23/20204/23/2020APASS
DetailsBrian Scoles
Ready for rough in inspection and gas line pressure and pvc flu pressure test. House open Phone #: ###-#### Inspection requested via web by Russ Curtis- 20lb gas pass tagged meter location- 5lb flue x 2 ok