Pressure Test | 8/7/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino -60lb,20lb,piping
|
Pressure Test | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | FAIL |
Ben Livingston
|
|
|
pressure test on underground gas lines Phone #: ###-#### Inspection requested via web by Debbie Marino - need to tape first 90 all 3 locations
|
Pressure Test | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | FAIL |
Ben Livingston
|
|
|
Need pressure test on underground gas lines Phone #: ###-#### Inspection requested via web by Debbie Marino - black pipe in 3 locations needs tape where it is underground, 20,60 lb okay
|
Rough-in | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | PASS |
Ben Livingston
|
|
|
Fireplace flue Phone #: ###-#### Inspection requested via web by Debbie Marino
|
Rough-in | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | CANC |
Ben Livingston
|
|
|
FP Flue test Phone #: ###-#### Inspection requested via web by Debbie Marino - canc per request
|
Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | FAIL |
Ben Livingston
|
|
|
FP Flue inspection Phone #: ###-#### Inspection requested via web by Debbie Marino - firestop around flues have open gaps - ducts on either side of fireplace need tobe riged pipe till they pass through fire stop
|
Rough-in | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | PASS |
Ben Livingston
|
|
|
Please call 2089418059 when you are on your way Phone #: ###-#### Inspection requested via web by Debbie Marino
|
Rough-in | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - condensate piping needs tobe 3/4 pvc at the point of first possible grade correction not made
|
Rough-in | 7/14/2020 | 7/15/2020 | 7/15/2020 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - condensate piping needs tobe 3/4 pvc at the point of first possible grade
|
Pressure Test | 7/14/2020 | 7/15/2020 | 7/15/2020 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - 60lb,5lb x5
|
Pressure Test | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - test at zero
|
Rough-in | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - condensate piping needs tobe 3/4 pvc at the point of first possible grade - need nail plates to protect linesets and condensate piping in wall closer that 1 1/2" - supply in basement feeding bed rooms above is going tobe crushed by data cable when its drywalled - 5lb flue x5 okay
|
Pressure Test | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | CANC |
Ben Livingston
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|
Rough-in | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | CANC |
Ben Livingston
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino Inspection cancelled from web by: Debbie Marino
|