Pressure Test | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - 60lb gas test ok - tagged meter location
|
Rough-in | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - R/I ok
|
Pressure Test | 5/18/2020 | 5/19/2020 | 5/19/2020 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - 60lb gas test fail - pressure test gas line with two valves and a open tee between them at meter or disconnect gas line from meter and cap
|
Pressure Test | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | NR |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN
|
Pressure Test | 5/13/2020 | 5/14/2020 | 5/14/2020 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN
- 60lb gas test fail - need to adjust permit details to reflect work being done for a R/I pass.
|
Rough-in | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - need gas pressure test - CSST gas line needs proper nail plates installed - verify what gas pressure will be supplied from meter
|