Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Jack Reynolds
|
|
|
Call Preston for access to the property if no one is there Phone #: ###-#### Inspection requested via web by Bob Ferrin - 5lb flue test ok - final ok
|
Final | 7/7/2020 | 7/9/2020 | 7/7/2020 | P | CANC |
Jack Reynolds
|
|
|
Call for access to property if no one is there Phone #: ###-#### >> Inspection requested via web by Bob Ferrin Inspection cancelled from web by: Bob Ferrin
|
Final | 6/28/2020 | 6/29/2020 | 6/29/2020 | A | FAIL |
Jack Reynolds
|
|
|
Call Preston for access to property if no one is there Phone #: ###-#### Inspection requested via web by Bob Ferrin - corrections still need made
|
Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | FAIL |
Jack Reynolds
|
|
|
Call for access to property if no one is there Phone #: ###-#### Inspection requested via web by Bob Ferrin -A/C locking caps - 5lb flue test fail re test
|
Rough-in | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Jack Reynolds
|
|
|
Please call with an ETA so I can make sure someone is there to give access Phone #: ###-#### Inspection requested via web by Bob Ferrin - 20lb gas test ok - R/I ok
|
Rough-in | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | NR |
Jack Reynolds
|
|
|
Please have inspector call Preston at the number listed above with an ETA so he can meet you there to open the property Phone #: ###-#### Inspection requested via web by Bob Ferrin - CSST needs proper nail plates installed - dryer vent needs R/I - duct work needs joints sealed - transfer openings will need to be installed by final - support gas line in basement
|
Pressure Test | 5/5/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Jack Reynolds
|
|
|
Please have inspector call Preston at the number listed above with an ETA so he can meet you there to open the property Phone #: ###-#### Inspection requested via web by Bob Ferrin - 20lb gas pressure test ok - will need to see 5lb flue test on furnace by final
|
Rough-in | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | FAIL |
Jack Reynolds
|
|
|
Please call Zeb, who is the job coordinator, at the number listed above with an ETA so he can meet you there to let you in Phone #: ###-#### Inspection requested via web by Bob Ferrin - Permit needs to reflect all the work being done to the HVAC - New HVAC system will need a ManJ approved by the City of Boise. - Gas lines need pressure tested
|