Final | 5/13/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Ben Livingston
|
|
|
The Roofer, the HVAC Tech, and the Inspector all need to coordinate to be there at 9:00AM Friday morning. Roofer and HVAC are scheduled. HVAC Contact: Craig ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
|
Pressure Test | 5/13/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Ben Livingston
|
|
|
The Roofer, the HVAC Tech, and the Inspector all need to coordinate to be there at 9:00AM Friday morning. Roofer and HVAC are scheduled. HVAC Contact: Craig ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 5lb passed virtual inspection
|
Pressure Test | 5/13/2020 | 5/14/2020 | 5/13/2020 | P | CANC |
Ben Livingston
|
|
|
We need to coordinate having the inspector, the roofer, and A1 Heating there all at the same time for a flue pressure test. Both the roofer and A1 are scheduled 1:00PM Thursday. Please coordinate together. Craig ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Final | 5/13/2020 | 5/14/2020 | 5/13/2020 | P | CANC |
Ben Livingston
|
|
|
We need to coordinate having the inspector, the roofer, and A1 Heating there all at the same time. Both the roofer and A1 are available in the PM Thursday, preferably around 1:00pm. Please coordinate together. Craig ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Final | 5/4/2020 | 5/6/2020 | 5/6/2020 | P | PART |
Ben Livingston
|
|
|
Please call our technician: Craig ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - part final virtual inspection, still need flue pressure test
|