Final | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Jack Reynolds
|
|
|
Installers will be on site. Phone #: ###-#### Inspection requested via web by max sanders - final ok
|
Pressure Test | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Jack Reynolds
|
|
|
Installers will be on site. Phone #: ###-#### Inspection requested via web by max sanders - 20lb gas test ok
|
Final | 6/9/2020 | 6/9/2020 | 6/9/2020 | P | FAIL |
Jack Reynolds
|
|
|
We roughed this in about 2 years ago. We had rough-in inspection on ductwork and furnace and a/c back then. furnace is in attic. Phone #: ###-#### Inspection requested via web by max sanders - platform in attic needs extended in front of furnace. Owner says he will take of this corrections - bvent needs 1" clearances - condensate line needs extended down to ground level outside - need a 20lb gas test - line set insulation in attic needs repaired
|