Final | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP
|
Final | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- per phone call from GC
|
Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- need timer installed on energy star fan in laundry room for mechanical ventilation
|
Final | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP 1- all lineset covers need sealed where linesets come out of cover 2- condensate drains exterior need 90 degree turned down and ran to below siding 3- condensate in front entry can not drain onto side walk 4- missing transfer register in laundry room and need timer installed per man j for fan operation 5- dryer duct needs to be extended out of wall and sealed
|
Rough-in | 6/17/2020 | 6/18/2020 | 6/18/2020 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- completed in am
|
Rough-in | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- R/I ok
|
Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP 1- need approved man j onsite 2- need barbed fittings installed on pvc drains at unit and hook poly tubing to it 3- need 14x8 transfer in laundry room 4- need nail plates on all condensate with in 1.5 inches of framing
ok to insulate exterior walls only
|