Final | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | CANC |
Jack Reynolds
|
|
|
Screened- joshua Phone #: ###-#### - should have been a R/I not a final - schedule final once finish materials have been install at a later date
|
Rough-in | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PASS |
Jack Reynolds
|
|
|
Screened- joshua Phone #: ###-#### - fireplace R/I ok
|
Final | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | FAIL |
Jack Reynolds
|
|
|
Josh *screened* Phone #: ###-#### - corrections still need made
|
Final | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | FAIL |
Jack Reynolds
|
|
|
screened // Christopher. Contractor: Joshua ###-#### Phone #: ###-#### - seal venting on top of fireplace using high temp silicone pg 21 item B
|