Final | 8/1/2020 | 8/3/2020 | 8/3/2020 | A | PART |
Jack Reynolds
|
|
|
Lockbox 9787 Beacon Building Company ###-#### A1 Heating ; Air Conditioning ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - hallway bathroom exhaust ok - need to see range hood venting finished for final
|
Rough-in | 6/26/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Jack Reynolds
|
|
|
Lockbox 9787 Phone #: ###-#### Inspection requested via web by Arielle Hendricks - R/I ok - will need to see hallway bathroom exhaust fan terminate outside by final
|
Rough-in | 6/24/2020 | 6/26/2020 | 6/26/2020 | A | CANC |
Jack Reynolds
|
|
|
Lockbox 9787 Builder ###-#### HVAC ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
Final | 6/22/2020 | 6/23/2020 | 6/23/2020 | P | CANC |
Jack Reynolds
|
|
|
Please call Blake on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - should have been a R/I
|
Rough-in | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | FAIL |
Jack Reynolds
|
|
|
Please call Blake on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - need to add another exhaust fan to permit one for master bath and one for main bath - need to see exhaust fans in place and terminated outside for R/I inspection - dryer vent ok, range vent ok
|