Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Eric Strole
|
|
|
PROJECT MANAGER SAM - ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
Final | 6/30/2020 | 7/7/2020 | 7/7/2020 | P | NR |
Eric Strole
|
|
|
INSTALLER SCOTT ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt-Not ready.
|
Pressure Test | 6/30/2020 | 7/7/2020 | 7/7/2020 | P | CANC |
Eric Strole
|
|
|
INSTALLER SCOTT ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|