Rough-in | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
Jack Reynolds
|
|
|
Call Dane in route to inspection ###-#### Phone #: ###-#### Inspection requested via web by Justin Osterhout - R/I ok
|
Final | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | CANC |
Jack Reynolds
|
|
|
Equipment located in garage Phone #: ###-#### Inspection requested via web by Justin Osterhout - should have been a R/I inspection
|
Rough-in | 7/24/2020 | 7/24/2020 | 7/24/2020 | A | FAIL |
Jack Reynolds
|
|
|
Equipment located in garage Phone #: ###-#### Inspection requested via web by Justin Osterhout - return duct above furnace needs sealed - two locations of round return duct needs insulated -bedrooms will need transfer air openings by final
|
Pressure Test | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | PASS |
Jack Reynolds
|
|
|
Nolan (tech on site ###-####) pressure gauges outside Phone #: ###-#### Inspection requested via web by Justin Osterhout - 20lb gas test ok - tagged meter location
|