Final | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | FAIL |
Brian Scoles
|
|
|
ready for final. Emailing balance report to Brian scores. Phone #: ###-#### Inspection requested via web by Drew Tverdy- M0.0 hood equipment shows a 7 foot hood- need to install hood shown or revise drawings with hood installed and submit to city of Boise for review-
|
Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Brian Scoles
|
|
|
Light test on hood to duct connection, make up air rough in. will be ready by 8:00 Phone #: ###-#### Inspection requested via web by Drew Tverdy- light test at hood connection ok- Roof ok- call in final when ready- send air balance report to me when ready
|
Rough-in | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Brian Scoles
|
|
|
light test on grease duct. will be ready by 9 Phone #: ###-#### Inspection requested via web by Drew Tverdy- light test on 12 feet of square duct with offset in middle ok
|