Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz
|
Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- still missing seal 1st floor above back door in truss space
|
Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz 1- framing needs completed around dryer duct and seal to termination box 2- seal missing few spots first floor
|