Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Brian Scoles
|
|
|
Kim ###-#### HVAC ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- R/I ok- engineered approved prints onsite for way system is ran- will need accessable platform to furnace installed by final- dust collection system will need permited by who ever is installing it
|
Rough-in | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | CANC |
Brian Scoles
|
|
|
Mike ; Kim Stolworthy ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- per text with Eric- will reschedule
|
Final | 7/22/2020 | 7/23/2020 | 7/23/2020 | P | FAIL |
Brian Scoles
|
|
|
Please call our installer Jeremy on your way - ###-#### - for a video inspection. Phone #: ###-#### Inspection requested via web by Arielle Hendricks- needs a roiugh in inspection- need approved drawings onsite one shows 2-26-20 and revision prints show 7-15-20 but have not been approved- will need access platforn to furnace or opening large enough for furnace to be romove unobstructed- Recall in when ready- talked with Jeremy onsite- whos doing dust collection system??
|