Rough-in | 8/10/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Gonzalez
|
Pressure Test | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Gonzalez- 20lb gas pass tagged meter location- 5lb flue pass
|
Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Gonzalez- crawl needs completed- issing seal- lineset ran on R/I
|
Pressure Test | 8/4/2020 | 8/5/2020 | 8/5/2020 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Gonzalez- gauge wont zero out
|