INSP - Final | 8/8/1995 | 8/8/1995 | 8/8/1995 | P | PASS |
Dave Lightfoot
|
|
|
FINAL/15 MIN
|
INSP - Final | 8/7/1995 | 8/7/1995 | 8/7/1995 | A | FAIL |
Dave Lightfoot
|
|
|
CORRECTIONS NOT MADE/SEE NOTICE/20 MIN
|
INSP - Final | 7/26/1995 | 7/26/1995 | 7/26/1995 | | FAIL |
Dave Lightfoot
|
|
|
CORRECTIONS/HOOD BACKDRAFT DAMPER ALL CUT UP, WOOD SHOWING/20 MIN
|
INSP - Framing/ Rough-in | 6/27/1995 | 6/27/1995 | 6/27/1995 | | PASS |
Dave Lightfoot
|
|
|
R/IN OK 15 MIN
|
INSP - Framing/ Rough-in | 6/23/1995 | 6/26/1995 | 6/26/1995 | | FAIL |
Dave Lightfoot
|
|
|
corrections-need dryer vent, need 12" clearance on flex duct in attic, need f/a duct. 10 min
|
INSP - Gas piping | 6/23/1995 | 6/26/1995 | 6/26/1995 | | PASS |
Alan Hauser
|
|
|
25735
|