INSP - Final | 7/28/1995 | 7/31/1995 | 7/31/1995 | A | PASS |
Alan Hauser
|
|
|
pipe fixed in crawl. 20 min
|
INSP - Conference | 7/27/1995 | 7/28/1995 | 7/28/1995 | A | PASS |
Alan Hauser
|
|
|
went over corrections with builder. 15 min
|
INSP - Final | 7/28/1995 | 7/28/1995 | 7/28/1995 | | FAIL |
Alan Hauser
|
|
|
FAIL/20 MIN/$20.00 REINSPECTION FEE
|
INSP - Final | 7/27/1995 | 7/28/1995 | 7/28/1995 | A | FAIL |
Alan Hauser
|
|
|
need to: insulate s.a. plenum, support s.a. run and kink pipe in crawl, vent dryer outdoors, and fix vent at furnace. 20 min.
|
INSP - Framing/ Rough-in | 7/5/1995 | 7/5/1995 | 7/5/1995 | | PASS |
|
|
|
ok 17 min
|
INSP - Gas pressure test | 7/5/1995 | 7/5/1995 | 7/5/1995 | | PASS |
|
|
|
26598
|