INSP - Final | 8/4/1995 | 8/4/1995 | 8/4/1995 | A | PASS |
Dave Lightfoot
|
|
|
FINAL/15 MIN/NO CARD
|
INSP - Final | 7/28/1995 | 7/28/1995 | 7/28/1995 | A | FAIL |
Dave Lightfoot
|
|
|
POST TO BE IN FRONT OF EQUIPMENT
|
INSP - Framing/ Rough-in | 7/5/1995 | 7/5/1995 | 7/5/1995 | | PASS |
Dave Lightfoot
|
|
|
7 MIN
|
INSP - Gas pressure test | 7/5/1995 | 7/5/1995 | 7/5/1995 | | PASS |
Dave Lightfoot
|
|
|
25732/8 MIN
|