INSP - Framing/ Rough-in | 8/22/1996 | 8/23/1996 | 8/23/1996 | A | PASS |
Dave Lightfoot
|
|
|
08/23/96 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 2/9/1996 | 2/12/1996 | 2/12/1996 | P | PART |
Dave Lightfoot
|
|
|
02/12/96 337 - THIS IS FOR MONDAY PM CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Gas pressure test | 12/5/1995 | 12/5/1995 | 12/5/1995 | P | PASS |
Dave Lightfoot
|
|
|
12/05/95 337 - GP -OK GAS PIPING
|
INSP - Gas pressure test | 11/30/1995 | 12/1/1995 | 12/1/1995 | P | FAIL |
Dave Lightfoot
|
|
|
12/01/95 337 - READY FRI PM CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Duct work | 8/28/1995 | 8/29/1995 | 8/29/1995 | A | PASS |
Dave Lightfoot
|
|
|
DUCT WORK OK/20 MIN
|
INSP - Duct work | 8/28/1995 | 8/28/1995 | 8/28/1995 | P | CANC |
|
|
|
08/28/95 326 - David's area/
|
INSP - Framing/ Rough-in | 7/19/1995 | 7/19/1995 | 7/19/1995 | | PASS |
|
|
|
ABS DUCT OK LEFT NOTE: ALL SHEET METAL DUCT MUST BE ENCASED IN 2" CONCRETE 13 MIN
|