INSP - Final | 9/8/1995 | 9/8/1995 | 9/8/1995 | | PASS |
Alan Hauser
|
|
|
/ / 350 - FNL -OK FINAL
|
INSP - Gas pressure test | 8/16/1995 | 8/16/1995 | 8/16/1995 | | PASS |
Alan Hauser
|
|
|
#27982 ADDED GAS PIPE TO GAS LOG IN MASONARY FIREPLACE
|
INSP - Framing/ Rough-in | 7/10/1995 | 7/10/1995 | 7/10/1995 | | PASS |
Alan Hauser
|
|
|
CORRECTIONS MADE R/I OK 20 MIN
|
INSP - Framing/ Rough-in | 7/7/1995 | 7/7/1995 | 7/7/1995 | | FAIL |
Alan Hauser
|
|
|
NEEDS CORRECTIONS 30 MIN
|
INSP - Gas pressure test | 7/7/1995 | 7/7/1995 | 7/7/1995 | | PASS |
Alan Hauser
|
|
|
#26148
|