INSP - Final | 9/15/1995 | 9/18/1995 | 9/18/1995 | A | PASS |
Dave Lightfoot
|
|
|
09/15/95 337 - FNL -OK FINAL
|
INSP - Final | 9/15/1995 | 9/18/1995 | 9/18/1995 | A | PASS |
Dave Lightfoot
|
|
|
09/15/95 337 - FNL -OK FINAL
|
INSP - Framing/ Rough-in | 7/20/1995 | 7/20/1995 | 7/20/1995 | A | PASS |
Alan Hauser
|
|
|
need to check comb.-air in basement on final. Jack from custom systems said that the basement was going to be unfinished. 20 min
|
INSP - Framing/ Rough-in | 7/19/1995 | 7/19/1995 | 7/19/1995 | P | FAIL |
Alan Hauser
|
|
|
no r/i upper and lower comb.-air need seperated all the way to the source. no literature on under slab heating in basement. f/p still needs outside combustion air 25 min
|
INSP - Gas pressure test | 7/14/1995 | 7/14/1995 | 7/17/1995 | | PASS |
Dave Lightfoot
|
|
|
#25744
|
INSP - Framing/ Rough-in | 7/14/1995 | 7/14/1995 | 7/14/1995 | | FAIL |
Dave Lightfoot
|
|
|
SEE CORRECTION NOTICE 45 MIN
|