INSP - Final | 8/15/1995 | 8/15/1995 | 8/15/1995 | | PASS |
|
|
|
FINAL OK 10 MIN
|
INSP - Framing/ Rough-in | 7/25/1995 | 7/25/1995 | 7/25/1995 | | |
|
|
|
|
INSP - Framing/ Rough-in | 7/25/1995 | 7/25/1995 | 7/25/1995 | A | PASS |
Alan Hauser
|
|
|
r/i was ready and ok. 15 min
|
INSP - Framing/ Rough-in | 7/24/1995 | 7/24/1995 | 7/24/1995 | P | FAIL |
Alan Hauser
|
|
|
was not ready 15 min
|
INSP - Framing/ Rough-in | 7/24/1995 | 7/24/1995 | 7/24/1995 | P | FAIL |
Alan Hauser
|
|
|
r/i was not done or ready. 10 min
|
INSP - Framing/ Rough-in | 7/21/1995 | 7/21/1995 | 7/21/1995 | | FAIL |
Alan Hauser
|
|
|
NOT READY 15 MIN
|
INSP - Gas pressure test | 7/21/1995 | 7/21/1995 | 7/21/1995 | | PASS |
|
|
|
#26181
|