INSP - Final | 8/16/1995 | 8/16/1995 | 8/16/1995 | | PASS |
Alan Hauser
|
|
|
|
INSP - Framing/ Rough-in | 7/27/1995 | 7/27/1995 | 7/27/1995 | A | PASS |
Alan Hauser
|
|
|
corrections were made. r/i ok 20 min
|
INSP - Framing/ Rough-in | 7/25/1995 | 7/25/1995 | 7/25/1995 | A | FAIL |
Alan Hauser
|
|
|
need to fix flex pipe at r.a. can in attic. 20 min
|
INSP - Gas pressure test | 7/25/1995 | 7/25/1995 | 7/25/1995 | A | PASS |
Alan Hauser
|
|
|
gas ok furn. and w/h #26185 20 min.
|